Study Recommends $1.6B in Improvements to Alberta High Load Corridor Start in Sturgeon / Monday, January 14, 2019 / Categories: Major Projects, News The Government of Alberta says that investment in upgrading the province’s High Load Corridor will take priority going forward as a new study recommends significant upgrades. The High Load Corridor enables large moves of construction and drilling equipment. The study identifies $1.6 billion in improvements over two decades. The announcement comes as the heaviest load to ever travel Alberta’s highways made its way from an Edmonton fabrication yard to the site of a new petrochemical facility being built by Inter Pipeline in Fort Saskatchewan. For more information on proposed improvements to Alberta's High Load Corridor, please click here. Previous Article Highway 38 - Vinca Bridge Next Article TELUS investing $100 million to connect St. Albert and parts of Sturgeon County directly to advanced fibre optic network Print 3957 Rate this article: No rating Tags: Alberta Heartland Load Industrial More links http://www.jwnenergy.com/article/2019/1/study-recommends-16b-improvements-alberta-high-load-corridor/